N化学メーカー|『ZEB Ready』認証

R&Dセンター

響きあう知の舞台

Data

  • Scheduled to be completed June, 2022
  • Structure S Structure
  • Structure Design Orimoto Structural Engineers
  • Site area 1373.70㎡
  • Total floor 4632.48㎡
  • Location Itabashi, Tokyo