東洋合成工業株式会社

感光材開発分析棟

Crystallization

Data

  • Completion April, 2024
  • Structure S Structure
  • Structure Design NCU
  • Site area. 54,865.66㎡
  • Total floor 4,494.77㎡
  • Location Tohnosho, Chiba