住友化学株式会社 |『ZEB Ready』認証
Innovation Center MEGURU
Gallery
-
撮影:ナカサ&パートナーズ 大谷 宗平
-
省エネ建築物(BEI < 0.5 ZEB Ready)
Data
-
Scheduled to be completed
June, 2024
-
Structure
S+RC Structure, mid-story isolated structure
-
Structure Design
Hojo Structure Research Institute
-
Site area.
3472.26㎡
-
Total floor
18990.41㎡
-
Location
Sodegaura, Chiba